---
title: "Workday Regression Testing for a Small In-House Team"
description: "Workday makes regression testing the customer's job. A regression pack a team of two to five can keep, what should trigger it all year, and how to test as the…"
url: https://kiweely.com/guides/workday-regression-testing
---

# Workday Regression Testing for a Small In-House Team: What to Retest, When, and as Whom

Workday says the customer is responsible for regression testing, and the twice-yearly release is only one reason to retest. Here is a regression pack a small in-house team can keep, the changes that should trigger it all year, and how to test as the people who use each process.

-   **Checked** against Workday on November 19
-   Applies to **In-house Workday teams of two to five people**
-   9 min read
-   Published November 19
-   By Kiweely

Workday regression testing for a small in-house team comes down to one short list: the processes that would hurt if they broke, run as the people who use them, every time something changes underneath them. Workday puts the job on you: “In all cases, the customer is responsible for regression testing.” This guide builds that list, says what should trigger it outside the R1 and R2 releases, and shows how to keep the record.

**Kiweely Nest (coming next)** is eleven AI specialists for your company’s own Workday, where every change is built and tested in a lower tenant before it reaches Production: where Nest fits, or [book a demo](https://kiweely.com/demo?for=nest).

Someone setting up release testing at a Workday customer [described](https://www.reddit.com/r/workday/comments/1r8q0en/) the problem on r/workday: “There’s not enough time to test everything and if you can’t test everything then they feel like it’s pointless to even test at all.” The answer for a team of two to five isn’t testing everything. It is testing the same short list every time something changes, and the whole list when the change is big.

The Workday facts come from Workday’s documentation, listed in the sources. The five-week release window has its own plan in [preparing for Workday 2027 R1 with a small team](https://kiweely.com/guides/workday-release-preparation-audit-checklist); this page is about the rest of the year.

## Who owns regression testing in Workday

Workday’s deployment methodology describes three kinds of regression testing in the Test stage of its [Student customer deployment guide](https://community-content.workday.com/en-us/public/learn/resources/customer-deployment/workday-methodology-overview-student-customer-deployment-guide/test-student.html). The first, which it says is “like an HCM or FIN deployment”, means taking up new functionality from the feature release and “regression testing to ensure that feature releases haven’t impacted existing configuration in unexpected ways.” Then:

-   “You might need to perform extra regression testing following weekly patches, especially when new functionality is released that supports your institution’s business needs.”
-   “In all cases, the customer is responsible for regression testing.”

It names three artifacts: a **Regression Test Plan**, **Regression Test Scenarios** and a **Testing Issues Log**. A small team can keep all three before it buys any tool: a page, a list and a log.

## What should trigger a retest, all year

The two feature releases are the big, planned retests. The smaller triggers are where small teams get caught, because nobody schedules them.

| What changed | How often | What to run | What helps |
| --- | --- | --- | --- |
| A feature release (R1, R2) | Twice a year. New features reach Sandbox Preview about five weeks earlier; then every tenant type gets the release on the same date | The whole pack, in Sandbox Preview |  **What’s New in Workday**, run in Sandbox Preview when release preparation begins. The week-by-week plan is in our [2027 R1 guide](https://kiweely.com/guides/workday-release-preparation-audit-checklist) |
| A weekly service update | Every week, in the weekend maintenance window | The scenarios tagged with any area a note touches |  **Weekly Service Update Notes** on Workday Community, which list the defects Workday fixes each week |
| Your own business process change | Whenever you make one | Every scenario that uses that process, as the role on each step |  **Business Process Exception Audit** |
| A security policy change | When you activate pending changes | The roles the change touches, tested as those people |  **Security Exception Audit** |
| An integration, vendor file or integration system user change | Whenever it changes | Launch it in Sandbox and compare the output with the last good file |  **Process Monitor**, process type Integration |
| The weekly Sandbox refresh | Every week | Nothing to retest, but test records and Sandbox-only setup are gone | Rebuild before the next test; see [what a Sandbox refresh wipes](https://kiweely.com/guides/workday-sandbox-refresh) |

Workday’s course manual describes weekly service updates as delivering “timely fixes and enhancements that are less impactful to customers”, and most in-house teams don’t run their whole pack every weekend. The cheap habit is to read the week’s notes and, when one touches a process you use, run that process’s scenarios on Monday. That is what the tags below are for.

## The regression pack, in three files

### 1\. The plan: one page

What is in scope, which tenant each kind of test runs in, who tests what, and what counts as passed. On tenants, Workday’s course manual describes the Sandbox as the place to “develop and test new features, customizations, and configurations before deploying into the main production tenant”, with data that “is typically a copy of the data in the actual production tenant.” Sandbox Preview is also a copy of Production, with the upcoming release’s functionality added. Workday’s tenants datasheet says the Sandbox is “refreshed on a weekly basis (data and configurations)” from Production, and that Implementation tenants “allow testing outside of the Sandbox tenants standard weekly refresh window.” So: your own changes in Sandbox, the release in Sandbox Preview, and anything that has to last more than a week in an Implementation tenant if you have one.

### 2\. The scenarios: one list, tagged

Start with the few that would stop people being hired or paid. The team in that r/workday thread already knew theirs: run a payroll, and take a hire through to separation. Those are the scenarios to run after any change. For the full list a release calls for (critical business processes, custom-built parts, complex configuration, critical reports), use the inventory order in our [2027 R1 guide](https://kiweely.com/guides/workday-release-preparation-audit-checklist) rather than starting from a vendor’s catalog.

Give each row the same few columns:

| Column | Example |
| --- | --- |
| Scenario | Hire through to first pay |
| Steps, as whom | HR partner starts the hire; the manager approves; the new hire completes their onboarding tasks; payroll checks the first pay result |
| Touches (tags) | Hire business process, HR partner security group, benefits carrier feed, pay group |
| Tenant and data | Sandbox; an open position that exists in Production, so it survives the refresh |
| Passed when | The worker exists with the right position, pay group and compensation, and the onboarding tasks reached the right inboxes |
| Owner, last run, result | Who, when, passed or the issue log line |

The **Touches** column does the work. When a weekly note mentions benefits, or a colleague changes the HR partner security group, filter the list by that tag and run only those rows. That is how a team of three retests something most weeks without retesting everything. Our [end-to-end testing guide](https://kiweely.com/guides/workday-end-to-end-testing) has a worked scenario layout for business processes, integrations and security.

### 3\. The issues log

Workday calls it the Testing Issues Log. Each line: the scenario, the tenant, who it was run as, what was seen, whether production behaves the same, who owns the fix, and when it closed. Record failures as they happened; a failure retried until it passes and marked green hides the next one. During a release, comparing each result with a baseline tenant and recording Same or Different separates a release change from an old quirk, as described in [regression testing across two tenants](https://kiweely.com/guides/workday-release-regression-testing-two-tenants).

## Test as the role, not as the admin

An administrator sees more than the people a process is for, so a test run as an admin passes where the manager’s inbox would be empty. Workday’s answer is proxy access. Its HCM course manual says proxy access policies “allow certain users to proxy in as other users, for testing purposes”, which “saves time when testing (e.g., business processes, reports) since you do not have to sign in and out as multiple users.” Authorized users run **Start Proxy**, pick the person, and act as them; **Stop Proxy** ends the session.

Two limits matter for planning. You can create, edit, view and delete proxy access policies “in any tenant environment except Production”, so role testing happens in Sandbox, Sandbox Preview or an Implementation tenant. And you can configure only one policy per environment, though one policy can cover several environments. Our guide to [testing as several personas with Start Proxy](https://kiweely.com/guides/workday-multi-persona-proxy-testing) covers the setup.

## What breaks quietly

Two Workday behaviors turn a small change into a regression nobody sees until an employee does.

**A security group removed from a policy.** Workday’s own example: you remove a security group from a business process security policy without removing it from the business process definition. Workday runs a background process every hour that finds exceptions on business process definitions, including those caused by changes outside the business process definition itself, and then prevents the business process from being started until it is fixed. It sends business process administrators a Fix Business Process task. Workday recommends testing business process changes in a preproduction tenant first and running **Business Process Exception Audit** after you update one. After activating security policy changes, **Security Exception Audit** lists what the change left invalid.

**An integration step inside a business process.** When an integration launched from a business process step fails, the whole parent business process terminates by default; Workday calls that “the designed and expected behavior.” You can instead redirect the failed step to a security group with **Maintain Redirect** on the Integration step, though Workday notes that for a Studio integration it acts only on a status of Failed, not Completed with Errors. So if an integration is chained into your hire process and its integration system user loses access to a security domain it needs (one of the causes Workday lists for an integration security error), the first sign is a terminated hire, not an integration error anyone went looking for. Workday’s troubleshooting route is **Process Monitor** on the Integration process type, then the integration events for each step; to find an integration system by name, type `intsys:` in the search box.

Both are reasons to keep integration-triggering processes and security groups in the **Touches** column: they are the tags a change most often hits without anyone thinking of testing.

## Where the pack fits in the rest of the year

The pack is the test step of change control: a change is built and tested outside Production before it moves, as in [Workday change control for a small team](https://kiweely.com/guides/workday-change-control-audit-trail). The weekly reading and the exception audits sit in the [tenant upkeep calendar](https://kiweely.com/guides/workday-tenant-upkeep-calendar). The release window is the [2027 R1 plan](https://kiweely.com/guides/workday-release-preparation-audit-checklist). Test data that survives the weekly refresh is in [building realistic test data](https://kiweely.com/guides/workday-test-data-sandbox).

On automation: the r/workday thread on [regression testing automation](https://www.reddit.com/r/workday/comments/1xin5tb/) asks whether anyone scripts “the boring stuff” after each release. Scripts that click by screen position or selector break when a release moves the screen. Tests written as goals (“as this manager, approve this compensation change and confirm the new pay”) depend less on where things sit on the screen; see [goal-driven agents versus scripts for release testing](https://kiweely.com/blog/workday-release-testing-goal-driven-agents-vs-scripts) and [Workday testing tools compared](https://kiweely.com/blog/workday-testing-tools-compared).

## Where Kiweely Nest fits

The pack is small, but someone has to run it every week on top of the tickets. **Kiweely Nest (coming next)** is built for the team carrying that load. As [kiweely.com/nest](https://kiweely.com/nest) describes it, Nest is eleven AI specialists for your company’s own Workday, led by Kai, the Solution Architect, who takes the goal, makes the plan and hands each part to the right specialist: Mila for core HCM setup and business processes, Sage for security groups, domains and policies, Theo for integrations, Studio and Extend, Ruby for reports. Its routines run checks on a schedule and reach you before your employees notice; a routine only reads and posts what it found. A change is built and tested in a lower tenant first, and bringing it to Production needs your recorded approval, with a change log you can export for your auditors.

Nest is $999 per seat a month, with 20,000 Kiweely Credits included each month, and it starts with a 30-day pilot whose $999 counts toward an annual contract. [Book a demo](https://kiweely.com/demo?for=nest) and bring your regression list.

## Frequently asked questions

### Who is responsible for regression testing in Workday?

The customer. Workday's deployment methodology says so in its Student customer deployment guide: "In all cases, the customer is responsible for regression testing." It names three artifacts for it: a Regression Test Plan, Regression Test Scenarios and a Testing Issues Log.

### Do we need to regression test every Workday weekly service update?

Not with the full pack. Workday describes weekly service updates as less impactful fixes and enhancements, but its methodology also says you might need extra regression testing after weekly patches. Read the Weekly Service Update Notes and run the scenarios for any area a note touches.

### How do I test Workday as another user?

With a proxy access policy and the Start Proxy task. Workday lets authorized users proxy in as other users for testing, so you don't sign in and out as each person. You can create proxy access policies in any tenant except Production, one policy per environment.

### What should a Workday regression test plan include?

What is in scope, which tenant each test runs in, who tests what and as whom, and what counts as passed. Keep the scenarios in a list tagged by the parts of the tenant each one touches, so a change tells you which rows to run, and log every failure as it happened.

## Sources checked

-   [Workday Tenants and Tools (HCM Core for Administrators)](https://doc.workday.com/workday-education/en-us/course-manuals/hcm-core-for-administrators/workday-tenants-and-tools.html)
-   [Concept: Exception Audit Reports](https://doc.workday.com/admin-guide/en-us/manage-workday/tenant-configuration/auditing/dan1370797846981.html)
-   [Integration Business Process Guidelines](https://doc.workday.com/admin-guide/en-us/manage-workday/business-processes/business-processes-guidelines/integration-business-process-guidelines.html)
-   [Integrations (Security for Administrators)](https://doc.workday.com/workday-education/en-us/course-manuals/security-for-administrators/integrations.html)
-   [Workday Tenants datasheet](https://www.workday.com/content/dam/web/en-us/documents/datasheets/workday-tenants-datasheet.pdf)

## Related guides

[All guides](https://kiweely.com/guides)

-   [### A Workday Tenant Upkeep Calendar: What an Admin Checks Every Week, Month, Quarter and Year A Workday tenant health check isn’t a once-a-year project. Here are the recurring checks as a calendar (service updates, failed integrations, exceptions, audit trails, access reviews, releases and the yearly cycles), each with the Workday report or task that does it.](https://kiweely.com/guides/workday-tenant-upkeep-calendar)
-   [### Workday Change Control for a Small Team: Request, Sandbox Test, Approval, Production and the Audit Trail One change control process for a small in-house Workday team, from request to Production, with the Workday reports (audit tags, Audit Trail, policy history) that show an auditor each change.](https://kiweely.com/guides/workday-change-control-audit-trail)
-   [### Automating Workday R1/R2 Release Regression Testing Across Two Tenants Workday’s two major releases (R1 and R2) give teams a 5-week Sandbox Preview window to catch breaking changes. Comparing Sandbox Preview directly against a baseline tenant—and recording Same vs. Different outcomes—catches regressions without maintaining brittle test scripts.](https://kiweely.com/guides/workday-release-regression-testing-two-tenants)
-   [### Workday Test Data: How to Build Realistic Data in a Sandbox or Implementation Tenant Workday has no test data generator. You get test data from a copy of Production, from loads you run yourself, or from demonstration tenants. This guide shows what survives a refresh and what does not.](https://kiweely.com/guides/workday-test-data-sandbox)
-   [### How do I plan end-to-end and regression testing in Workday, and what does a test scenario cover? An end-to-end Workday test follows one transaction through every role, integration and record it touches. Regression testing repeats the same scenarios after a weekly service update or a twice-yearly feature release, first in Sandbox Preview.](https://kiweely.com/guides/workday-end-to-end-testing)
-   [### Multi-Persona Testing in Workday: Verifying the Proxy Chain in Sandbox Step through the multi-persona proxy testing sequence in Workday Sandbox. Verify role handoffs, condition rule evaluation, and field writebacks across each approval tier.](https://kiweely.com/guides/workday-multi-persona-proxy-testing)
-   [### Preparing for Workday 2027 R1 With a Small Team: The Timeline, What to Test in Sandbox Preview, and Who Does What Workday’s 2027 R1 feature release reaches Production in March 2027, with Sandbox Preview about five weeks earlier. Here is what Workday publishes when, a week-by-week test plan for a small team, and where AI testing fits.](https://kiweely.com/guides/workday-release-preparation-audit-checklist)
-   [### When does the Workday Sandbox refresh, and what does it wipe? Weekly: Workday replaces the Sandbox with a full copy of Production data and configuration. Public Workday docs give no day or hour, so ask your tenant management contact. Preview refreshes twice a year, Implementation on demand.](https://kiweely.com/guides/workday-sandbox-refresh)

### More guides on Tenants and developer accounts

[All 25 guides](https://kiweely.com/guides#tenants)

-   [How Big Should a Workday Team Be? Team Size by Company Size, From 30 Teams’ Own Numbers](https://kiweely.com/guides/workday-team-size-by-company-size)
-   [Is Kiweely free for a Workday personal developer tenant?](https://kiweely.com/guides/is-kiweely-free-personal-developer-tenant)
-   [Testing in a Workday Implementation: What’s Tested, by Whom, How Long, and What Can Be Automated](https://kiweely.com/guides/workday-implementation-testing)
-   [How Long Does a Workday Implementation Take? Workday’s Own Timelines by Scope](https://kiweely.com/guides/how-long-does-a-workday-implementation-take)
-   [Start a proxy test after an AI-suggested Workday change](https://kiweely.com/guides/workday-start-proxy-testing-after-ai-changes)
-   [When a Successful Payroll File Still Has the Wrong Tax or Garnishment](https://kiweely.com/guides/payroll-files-that-succeed-while-tax-and-garnishment-are-wrong)
-   [What Breaks a Workday Payroll File the Night Before Pay](https://kiweely.com/guides/what-breaks-a-workday-payroll-file-the-night-before-pay)
-   [Separating Production and Sandbox Workday Endpoints So Demos Miss Live Workers](https://kiweely.com/guides/separate-production-and-sandbox-workday-endpoints)

### From the blog on Tenants and developer accounts

[All posts](https://kiweely.com/blog)

-   [Risk of Personal MCP Servers Pointed at a Client Workday Sandbox](https://kiweely.com/blog/risk-personal-mcp-servers-client-workday-sandbox)
-   [Shadow AI in Workday AMS: Detecting Consultants Pasting Tenant Screenshots](https://kiweely.com/blog/shadow-ai-in-workday-ams-pasting-tenant-screenshots)
-   [Offboarding a Contractor Who Used Personal Codex on Your Workday Tenant](https://kiweely.com/blog/offboard-contractor-personal-codex-workday)

## Your own AI Workday team, working from day one.

Kiweely Nest is coming next: eleven AI specialists for your company's Workday, and nothing changes in your tenant until you approve.

[Book a demo](https://kiweely.com/demo?for=nest) [See Kiweely Nest](https://kiweely.com/nest)

## Get the next guide in your inbox.

One email a month with new guides and one Extend tip. Nothing else.
